A precise solution for your electricity supply needs
With 242 MW of power, the San Luis de la Paz Combined Cycle Plant plays a key role in Mexico’s energy security, providing, along with the Bajío plant, 40% of the electricity required by Guanajuato.
Plant highlights:
- Air-cooled condensers: Save up to 95% of water.
- Water treatment plant: Processes municipal wastewater, reuses it for power generation, and returns the surplus for park and garden irrigation.
- Emissions control system: Reduces pollutant emissions by detecting the optimal combustion point.
Location
San Luis de la Paz, Guanajuato
Technology type
Combined Cycle
Generation capacity
242 MW
Start of operations
August, 2015
Certifications
Clean Industry Certification since 2019
Safe Start (Gold level)
Equator Principles